eml release

Chad Berkley berkley at hyperion.nceas.ucsb.edu
Sat Apr 20 20:51:10 PDT 2002


Hi Matt,

We should probably release a beta8 with the updated pngs.  I didn't 
realize that those weren't updated, although I should have.  That's funny 
that that error was in the entity schema.  I validated all of the schemas 
with xml spy (I guess I really can't trust that software anymore).  What 
validation engine did you use?  xerces?  Do you want me to do this 
tomorrow or can it wait until Monday?

chad

On Sat, 20 Apr 2002, Matt Jones wrote:

> Thanks Chad.
> 
> I was looking at the release and noticed that none of the png files were 
> updated, so the documentation is a out of sync with the pictures.  I'll 
> try to reproduce all of the pictures and check them into CVS today.  Do 
> you think we should fix the release before we announce it more broadly? 
>   I'm tempted to just fix beta7, but really the right way to do it would 
> be to create a beta8 in case someone already downloaded beta7.  What do 
> you think?
> 
> Matt
> 
> Chad Berkley wrote:
> > Hi Matt.
> > 
> > EML is released.  The web site is all updated.  Let me know if you find 
> > anything wrong.  I should be here all weekend so I can do some fixes if 
> > need be.
> > 
> > chad
> > 
> 
> 
> 
> 

-- 
-------------------------------
Chad Berkley
National Center for Ecological
Analysis and Synthesis (NCEAS)
735 State St. Ste. 204
Santa Barbara, CA 93101
805-892-2530
berkley at nceas.ucsb.edu
-------------------------------




More information about the Eml-dev mailing list